Fla. Stat. 380.0937
Public financing of construction projects within areas at risk due to sea level rise


(1)

As used in this section, the term:“Area at risk due to sea level rise” means any location that is projected to be below the threshold for tidal flooding within the next 50 years by adding sea level rise using the highest of the sea level rise projections required by s. 380.093(3)(d)3.b. For purposes of this paragraph, the threshold for tidal flooding is 2 feet above mean higher high water.“Department” means the Department of Environmental Protection.“Potentially at-risk structure or infrastructure” means any of the following when within an area at risk due to sea level rise:
A critical asset as defined in s. 380.093(2)(a)1.-3.
A historical or cultural asset.
“Public entity” means the state or any of its political subdivisions, or any municipality, county, agency, special district, authority, or other public body corporate of the state which is demonstrated to perform a public function or to serve a governmental purpose that could properly be performed or served by an appropriate governmental unit.“Significant flood damage” means flood, erosion, inundation, or wave action damage resulting from a discrete or compound natural hazard event, such as a flood or tropical weather system, where such damage exceeds:
Twenty-five percent of the replacement cost of the potentially at-risk structure or infrastructure at the time of the event; or
A defined threshold established by the department by rule, in coordination with the Department of Transportation and water management districts, for a potentially at-risk structure or infrastructure for which replacement cost is not an appropriate metric, such as roadways. The threshold must be established by July 1, 2024.
“SLIP study” means a sea level impact projection study as established by the department pursuant to subsection (3).“State-financed constructor” means a public entity that commissions or manages a construction project using funds appropriated from the state.

(a)

“Area at risk due to sea level rise” means any location that is projected to be below the threshold for tidal flooding within the next 50 years by adding sea level rise using the highest of the sea level rise projections required by s. 380.093(3)(d)3.b. For purposes of this paragraph, the threshold for tidal flooding is 2 feet above mean higher high water.

(b)

“Department” means the Department of Environmental Protection.

(c)

“Potentially at-risk structure or infrastructure” means any of the following when within an area at risk due to sea level rise:A critical asset as defined in s. 380.093(2)(a)1.-3.A historical or cultural asset.
1. A critical asset as defined in s. 380.093(2)(a)1.-3.
2. A historical or cultural asset.

(d)

“Public entity” means the state or any of its political subdivisions, or any municipality, county, agency, special district, authority, or other public body corporate of the state which is demonstrated to perform a public function or to serve a governmental purpose that could properly be performed or served by an appropriate governmental unit.

(e)

“Significant flood damage” means flood, erosion, inundation, or wave action damage resulting from a discrete or compound natural hazard event, such as a flood or tropical weather system, where such damage exceeds:Twenty-five percent of the replacement cost of the potentially at-risk structure or infrastructure at the time of the event; orA defined threshold established by the department by rule, in coordination with the Department of Transportation and water management districts, for a potentially at-risk structure or infrastructure for which replacement cost is not an appropriate metric, such as roadways. The threshold must be established by July 1, 2024.
1. Twenty-five percent of the replacement cost of the potentially at-risk structure or infrastructure at the time of the event; or
2. A defined threshold established by the department by rule, in coordination with the Department of Transportation and water management districts, for a potentially at-risk structure or infrastructure for which replacement cost is not an appropriate metric, such as roadways. The threshold must be established by July 1, 2024.

(f)

“SLIP study” means a sea level impact projection study as established by the department pursuant to subsection (3).

(g)

“State-financed constructor” means a public entity that commissions or manages a construction project using funds appropriated from the state.

(2)

Beginning July 1, 2024, a state-financed constructor may not commence construction of a potentially at-risk structure or infrastructure without:Conducting a SLIP study that meets the requirements established by the department;Submitting the study to the department; andReceiving notification from the department that the study was received and that it has been published on the department’s website pursuant to paragraph (6)(a) for at least 30 days. The state-financed constructor is solely responsible for ensuring that the study submitted to the department for publication meets the requirements of subsection (3).

(a)

Conducting a SLIP study that meets the requirements established by the department;

(b)

Submitting the study to the department; and

(c)

Receiving notification from the department that the study was received and that it has been published on the department’s website pursuant to paragraph (6)(a) for at least 30 days. The state-financed constructor is solely responsible for ensuring that the study submitted to the department for publication meets the requirements of subsection (3).

(3)

The department shall develop by rule a standard by which a state-financed constructor must conduct a SLIP study and may require that a professional engineer sign off on the study. The rule applies only to projects not yet commenced as of the date the rule is finalized. The rule may not apply retroactively to projects that commenced before the date the rule is finalized. At a minimum, the standard must require that a state-financed constructor do all of the following:Use a systematic, interdisciplinary, and scientifically accepted approach in the natural sciences and construction design in conducting the study.Assess the flooding, inundation, and wave action damage risks relating to the potentially at-risk structure or infrastructure over its expected life or 50 years, whichever is less.
The assessment must take into account potential relative local sea-level rise and increased storm risk during the expected life of the potentially at-risk structure or infrastructure or 50 years, whichever is less, and, to the extent possible, account for the construction of sea-level rise versus land subsidence to the relative local sea-level rise.
The assessment must provide scientific and engineering evidence of the risk to the potentially at-risk structure or infrastructure and methods used to mitigate, adapt to, or reduce this risk.
The assessment must use and consider available scientific research and generally accepted industry practices.
The assessment must provide an estimated probability of significant flood damage to the potentially at-risk structure or infrastructure over the expected life of the structure or infrastructure or 50 years, whichever is less.
The assessment must analyze potential public safety and environmental impacts resulting from damage to the potentially at-risk structure or infrastructure, including, but not limited to, leakage of pollutants, electrocution and explosion hazards, and hazards resulting from floating or flying structural debris.
Provide alternatives for the design and siting of the potentially at-risk structure or infrastructure and analyze how such alternatives would impact the risks specified in subparagraph (b)5. as well as the risk and cost associated with maintaining, repairing, and constructing the potentially at-risk structure or infrastructure.Provide a list of flood mitigation strategies evaluated as part of the design of the potentially at-risk structure or infrastructure and identify appropriate flood mitigation strategies for consideration as part of the potentially at-risk structure or infrastructure design.

If multiple potentially at-risk structures or infrastructures are to be built concurrently within one project, a state-financed constructor may conduct and submit one SLIP study for the entire project for publication by the department.

(a)

Use a systematic, interdisciplinary, and scientifically accepted approach in the natural sciences and construction design in conducting the study.

(b)

Assess the flooding, inundation, and wave action damage risks relating to the potentially at-risk structure or infrastructure over its expected life or 50 years, whichever is less.The assessment must take into account potential relative local sea-level rise and increased storm risk during the expected life of the potentially at-risk structure or infrastructure or 50 years, whichever is less, and, to the extent possible, account for the construction of sea-level rise versus land subsidence to the relative local sea-level rise.The assessment must provide scientific and engineering evidence of the risk to the potentially at-risk structure or infrastructure and methods used to mitigate, adapt to, or reduce this risk.The assessment must use and consider available scientific research and generally accepted industry practices.The assessment must provide an estimated probability of significant flood damage to the potentially at-risk structure or infrastructure over the expected life of the structure or infrastructure or 50 years, whichever is less.The assessment must analyze potential public safety and environmental impacts resulting from damage to the potentially at-risk structure or infrastructure, including, but not limited to, leakage of pollutants, electrocution and explosion hazards, and hazards resulting from floating or flying structural debris.
1. The assessment must take into account potential relative local sea-level rise and increased storm risk during the expected life of the potentially at-risk structure or infrastructure or 50 years, whichever is less, and, to the extent possible, account for the construction of sea-level rise versus land subsidence to the relative local sea-level rise.
2. The assessment must provide scientific and engineering evidence of the risk to the potentially at-risk structure or infrastructure and methods used to mitigate, adapt to, or reduce this risk.
3. The assessment must use and consider available scientific research and generally accepted industry practices.
4. The assessment must provide an estimated probability of significant flood damage to the potentially at-risk structure or infrastructure over the expected life of the structure or infrastructure or 50 years, whichever is less.
5. The assessment must analyze potential public safety and environmental impacts resulting from damage to the potentially at-risk structure or infrastructure, including, but not limited to, leakage of pollutants, electrocution and explosion hazards, and hazards resulting from floating or flying structural debris.

(c)

Provide alternatives for the design and siting of the potentially at-risk structure or infrastructure and analyze how such alternatives would impact the risks specified in subparagraph (b)5. as well as the risk and cost associated with maintaining, repairing, and constructing the potentially at-risk structure or infrastructure.

(d)

Provide a list of flood mitigation strategies evaluated as part of the design of the potentially at-risk structure or infrastructure and identify appropriate flood mitigation strategies for consideration as part of the potentially at-risk structure or infrastructure design.

(4)

If a state-financed constructor commences construction of a potentially at-risk structure or infrastructure but has not complied with the SLIP study requirement under subsection (2), the department may bring a civil action in a court of competent jurisdiction to:Seek injunctive relief to cease further construction of the potentially at-risk structure or infrastructure or to enforce compliance with this section or with rules adopted by the department pursuant to this section.If the potentially at-risk structure or infrastructure has been completed or has been substantially completed, seek recovery of all or a portion of state funds expended on the potentially at-risk structure or infrastructure.

(a)

Seek injunctive relief to cease further construction of the potentially at-risk structure or infrastructure or to enforce compliance with this section or with rules adopted by the department pursuant to this section.

(b)

If the potentially at-risk structure or infrastructure has been completed or has been substantially completed, seek recovery of all or a portion of state funds expended on the potentially at-risk structure or infrastructure.

(5)

This section does not create a cause of action for damages or otherwise authorize the imposition of penalties by a public entity for failure to implement what is contained in the SLIP study.

(6)

The department:Shall publish and maintain a copy of each SLIP study submitted pursuant to this section on its website for at least 10 years after the date the department receives the study. However, any portion of a study containing information that is exempt from s. 119.07(1) and s. 24(a), Art. I of the State Constitution must be redacted by the department before publication.Shall adopt rules as necessary to administer this section.May enforce the requirements of this section.

(a)

Shall publish and maintain a copy of each SLIP study submitted pursuant to this section on its website for at least 10 years after the date the department receives the study. However, any portion of a study containing information that is exempt from s. 119.07(1) and s. 24(a), Art. I of the State Constitution must be redacted by the department before publication.

(b)

Shall adopt rules as necessary to administer this section.

(c)

May enforce the requirements of this section.

Source: Section 380.0937 — Public financing of construction projects within areas at risk due to sea level rise, https://www.­flsenate.­gov/Laws/Statutes/2024/0380.­0937 (accessed Aug. 7, 2025).

380.04
Definition of development
380.05
Areas of critical state concern
380.06
Developments of regional impact
380.07
Florida Land and Water Adjudicatory Commission
380.08
Protection of landowners’ rights
380.11
Enforcement
380.12
Rights unaffected by ch. 75-22
380.012
Short title
380.021
Purpose
380.031
Definitions
380.032
State land planning agency
380.045
Resource planning and management committees
380.051
Coordinated agency review
380.055
Big Cypress Area
380.061
The Florida Quality Developments program
380.085
Judicial review relating to permits and licenses
380.093
Resilient Florida Grant Program
380.095
Dedicated funding for conservation lands, resiliency, and clean water infrastructure
380.115
Vested rights and duties
380.0551
Green Swamp Area
380.0552
Florida Keys Area
380.0553
Brevard Barrier Island Area
380.0555
Apalachicola Bay Area
380.0651
Statewide guidelines, standards, and exemptions
380.0655
Expedited permitting process for marina projects reserving 10 percent or more boat slips for public use
380.0657
Expedited permitting process for economic development projects
380.0661
Legislative intent
380.0662
Definitions
380.0663
Land authority
380.0664
Quorum
380.0665
Executive director
380.0666
Powers of land authority
380.0667
Advisory committee
380.0668
Bonds
380.0669
State and local government liability on bonds
380.0671
Annual report
380.0672
Conflicts of interest
380.0673
Exemption from taxes and eligibility as investment
380.0674
Corporate existence
380.0675
Inconsistent provisions of other laws superseded
380.0685
State park in area of critical state concern in county which creates land authority
380.0933
Florida Flood Hub for Applied Research and Innovation
380.0935
Resilient Florida Trust Fund
380.0937
Public financing of construction projects within areas at risk due to sea level rise

Current through Fall 2025

§ 380.0937. Pub. financing of construction projects within areas at risk due to sea level rise's source at flsenate​.gov