Fla. Stat. 373.1501
South Florida Water Management District as local sponsor


(1)

As used in this section and s. 373.026(8), the term:“C-111 Project” means the project identified in the Central and Southern Florida Flood Control Project, Real Estate Design Memorandum, Canal 111, South Miami-Dade County, Florida.“Department” means the Department of Environmental Protection.“District” means the South Florida Water Management District.“Kissimmee River Restoration Project” means the project identified in the Project Cooperation Agreement between the United States Department of the Army and the South Florida Water Management District dated March 22, 1994.“Pal-Mar Project” means the Pal-Mar (West Jupiter Wetlands) lands identified in the Save Our Rivers 2000 Land Acquisition and Management Plan approved by the South Florida Water Management District on September 9, 1999 (Resolution 99-94).“Project” means the Central and Southern Florida Project.“Project component” means any structural or operational change, resulting from the restudy, to the Central and Southern Florida Project as it existed and was operated as of January 1, 1999.“Restudy” means the Comprehensive Review Study of the Central and Southern Florida Project, for which federal participation was authorized by the federal Water Resources Development Acts of 1992 and 1996 together with related congressional resolutions and for which participation by the South Florida Water Management District is authorized by this section. The term includes all actions undertaken pursuant to the aforementioned authorizations which will result in recommendations for modifications or additions to the Central and Southern Florida Project.“Southern Corkscrew Regional Ecosystem Watershed Project” means the area described in the Critical Restoration Project Contract C-9906 Southern Corkscrew Regional Ecosystem Watershed Project Addition/Imperial River Flowway and approved by the South Florida Water Management District on August 12, 1999.“Water Preserve Areas” means those areas located only within Palm Beach and Broward counties that are designated as Water Preserve Areas, as approved by the South Florida Water Management District Governing Board on September 11, 1997, and shall also include all of those lands within Cell II of the East Coast Buffer in Broward County as delineated in the boundary survey prepared by Stoner and Associates, Inc., dated January 31, 2000, SWFWMD #10953.“Ten Mile Creek Project” means the Ten Mile Creek Water Preserve Area identified in the Central and Southern Florida Ecosystem Critical Project Letter Report dated April 13, 1998.

(a)

“C-111 Project” means the project identified in the Central and Southern Florida Flood Control Project, Real Estate Design Memorandum, Canal 111, South Miami-Dade County, Florida.

(b)

“Department” means the Department of Environmental Protection.

(c)

“District” means the South Florida Water Management District.

(d)

“Kissimmee River Restoration Project” means the project identified in the Project Cooperation Agreement between the United States Department of the Army and the South Florida Water Management District dated March 22, 1994.

(e)

“Pal-Mar Project” means the Pal-Mar (West Jupiter Wetlands) lands identified in the Save Our Rivers 2000 Land Acquisition and Management Plan approved by the South Florida Water Management District on September 9, 1999 (Resolution 99-94).

(f)

“Project” means the Central and Southern Florida Project.

(g)

“Project component” means any structural or operational change, resulting from the restudy, to the Central and Southern Florida Project as it existed and was operated as of January 1, 1999.

(h)

“Restudy” means the Comprehensive Review Study of the Central and Southern Florida Project, for which federal participation was authorized by the federal Water Resources Development Acts of 1992 and 1996 together with related congressional resolutions and for which participation by the South Florida Water Management District is authorized by this section. The term includes all actions undertaken pursuant to the aforementioned authorizations which will result in recommendations for modifications or additions to the Central and Southern Florida Project.

(i)

“Southern Corkscrew Regional Ecosystem Watershed Project” means the area described in the Critical Restoration Project Contract C-9906 Southern Corkscrew Regional Ecosystem Watershed Project Addition/Imperial River Flowway and approved by the South Florida Water Management District on August 12, 1999.

(j)

“Water Preserve Areas” means those areas located only within Palm Beach and Broward counties that are designated as Water Preserve Areas, as approved by the South Florida Water Management District Governing Board on September 11, 1997, and shall also include all of those lands within Cell II of the East Coast Buffer in Broward County as delineated in the boundary survey prepared by Stoner and Associates, Inc., dated January 31, 2000, SWFWMD #10953.

(k)

“Ten Mile Creek Project” means the Ten Mile Creek Water Preserve Area identified in the Central and Southern Florida Ecosystem Critical Project Letter Report dated April 13, 1998.

(2)

The Legislature finds that the restudy is important for restoring the Everglades ecosystem and sustaining the environment, economy, and social well-being of South Florida. It is the intent of the Legislature to facilitate and support the restudy through a process concurrent with Federal Government review and congressional authorization. Nothing in this section is intended in any way to limit federal agencies or Congress in the exercise of their duties and responsibilities. It is further the intent of the Legislature that all project components be implemented through the appropriate processes of this chapter and be consistent with the balanced policies and purposes of this chapter, specifically s. 373.016.

(3)

The Legislature declares that the Kissimmee River Project, the Ten Mile Creek Project, the Water Preserve Areas, the Southern Corkscrew Regional Ecosystem Watershed Project, the Pal-Mar Project, and the C-111 Project are in the public interest, for a public purpose, and necessary for the public health and welfare. The governing board of the district is empowered and authorized to acquire fee title or easement by eminent domain for the limited purposes of implementing the Kissimmee River Project, the Ten Mile Creek Project, the Water Preserve Areas, the Southern Corkscrew Regional Ecosystem Watershed Project, the Pal-Mar Project, and the C-111 Project. Any acquisition of real property, including by eminent domain, for those objectives constitutes a public purpose for which it is in the public interest to expend public funds. Notwithstanding any provision of law to the contrary, such properties shall not be removed from the district’s plan of acquisition, and the use of state funds for these properties is authorized. In the absence of willing sellers, any land necessary for implementing the projects in this subsection shall be acquired in accordance with state condemnation law pursuant to chapters 73 and 74.

(4)

The district is authorized to act as local sponsor of the project for those project features within the district as provided in this subsection and subject to the oversight of the department as further provided in s. 373.026. The district shall exercise the authority of the state to allocate quantities of water within its jurisdiction, including the water supply in relation to the project, and be responsible for allocating water and assigning priorities among the other water uses served by the project pursuant to state law. The district may:Act as local sponsor for all project features previously authorized by Congress.Continue data gathering, analysis, research, and design of project components, participate in preconstruction engineering and design documents for project components, and further refine the Comprehensive Plan of the restudy as a guide and framework for identifying other project components.Construct pilot projects that will assist in determining the feasibility of technology included in the Comprehensive Plan of the restudy.Act as local sponsor for project components.

(a)

Act as local sponsor for all project features previously authorized by Congress.

(b)

Continue data gathering, analysis, research, and design of project components, participate in preconstruction engineering and design documents for project components, and further refine the Comprehensive Plan of the restudy as a guide and framework for identifying other project components.

(c)

Construct pilot projects that will assist in determining the feasibility of technology included in the Comprehensive Plan of the restudy.

(d)

Act as local sponsor for project components.

(5)

In its role as local sponsor for the project, the district shall comply with its responsibilities under this chapter and implement project components through appropriate provisions of this chapter. In the development of project components, the district shall:Analyze and evaluate all needs to be met in a comprehensive manner and consider all applicable water resource issues, including water supply, water quality, flood protection, threatened and endangered species, and other natural system and habitat needs;Determine with reasonable certainty that all project components are feasible based upon standard engineering practices and technologies and are the most efficient and cost-effective of feasible alternatives or combination of alternatives, consistent with restudy purposes, implementation of project components, and operation of the project;Determine with reasonable certainty that all project components are consistent with applicable law and regulations, and can be permitted and operated as proposed. For purposes of such determination:
The district shall convene a preapplication conference with all state and federal agencies with applicable regulatory jurisdiction;
State agencies with applicable regulatory jurisdiction shall participate in the preapplication conference and provide information necessary for the district’s determination; and
The district shall request that federal agencies with applicable regulatory jurisdiction participate in the preapplication conference and provide information necessary for the district’s determination;
Consistent with this chapter, the purposes for the restudy provided in the Water Resources Development Act of 1996, and other applicable federal law, provide reasonable assurances that the quantity of water available to existing legal users shall not be diminished by implementation of project components so as to adversely impact existing legal users, that existing levels of service for flood protection will not be diminished outside the geographic area of the project component, and that water management practices will continue to adapt to meet the needs of the restored natural environment.Ensure that implementation of project components is coordinated with existing utilities and public infrastructure and that impacts to and relocation of existing utility or public infrastructure are minimized.

(a)

Analyze and evaluate all needs to be met in a comprehensive manner and consider all applicable water resource issues, including water supply, water quality, flood protection, threatened and endangered species, and other natural system and habitat needs;

(b)

Determine with reasonable certainty that all project components are feasible based upon standard engineering practices and technologies and are the most efficient and cost-effective of feasible alternatives or combination of alternatives, consistent with restudy purposes, implementation of project components, and operation of the project;

(c)

Determine with reasonable certainty that all project components are consistent with applicable law and regulations, and can be permitted and operated as proposed. For purposes of such determination:The district shall convene a preapplication conference with all state and federal agencies with applicable regulatory jurisdiction;State agencies with applicable regulatory jurisdiction shall participate in the preapplication conference and provide information necessary for the district’s determination; andThe district shall request that federal agencies with applicable regulatory jurisdiction participate in the preapplication conference and provide information necessary for the district’s determination;
1. The district shall convene a preapplication conference with all state and federal agencies with applicable regulatory jurisdiction;
2. State agencies with applicable regulatory jurisdiction shall participate in the preapplication conference and provide information necessary for the district’s determination; and
3. The district shall request that federal agencies with applicable regulatory jurisdiction participate in the preapplication conference and provide information necessary for the district’s determination;

(d)

Consistent with this chapter, the purposes for the restudy provided in the Water Resources Development Act of 1996, and other applicable federal law, provide reasonable assurances that the quantity of water available to existing legal users shall not be diminished by implementation of project components so as to adversely impact existing legal users, that existing levels of service for flood protection will not be diminished outside the geographic area of the project component, and that water management practices will continue to adapt to meet the needs of the restored natural environment.

(e)

Ensure that implementation of project components is coordinated with existing utilities and public infrastructure and that impacts to and relocation of existing utility or public infrastructure are minimized.

(6)

The department and the district shall expeditiously pursue implementation of project modifications previously authorized by Congress or the Legislature, including the Everglades Construction Project. Project components should complement and should not delay project modifications previously authorized.

(7)

When developing or implementing water control plans or regulation schedules required for the operation of the project, the district shall provide recommendations to the United States Army Corps of Engineers which are consistent with all district programs and plans.

(8)

Notwithstanding any provision of this section, nothing herein shall be construed to modify or supplant the authority of the district or the department to prevent harm to the water resources as provided in this chapter.

(9)

Final agency action with regard to any project component subject to s. 373.026(8)(b) shall be taken by the department. Actions taken by the district pursuant to subsection (5) shall not be considered final agency action. Any petition for formal proceedings filed pursuant to ss. 120.569 and 120.57 shall require a hearing under the summary hearing provisions of s. 120.574, which shall be mandatory. The final hearing under this section shall be held within 30 days after receipt of the petition by the Division of Administrative Hearings.

(10)(a)

By October 1, 2023, and each October 1 thereafter, the district shall prepare and submit a consolidated annual report regarding the status of the United States Army Corps of Engineers Section 216 Central and Southern Florida Project Infrastructure Resiliency Study to the Office of Economic and Demographic Research, the department, the Governor, the President of the Senate, and the Speaker of the House of Representatives.The report must include:
A summary of the findings in the district’s annual sea level rise and flood resiliency plan.
A list of structures that are expected to fall below the expected service level in the next 5 years.
Initial recommendations for the refurbishment or replacement of the structures identified in subparagraph 2., including:
Future cost estimates and timelines for the refurbishment or replacement of the most vulnerable structures.
An estimate of project costs and current funds available to implement the recommendations for each vulnerable structure based on a 10-year horizon.
A summary of the state and federal funds expended toward the implementation of the United States Army Corps of Engineers Section 216 Central and Southern Florida Project Infrastructure Resiliency Study and other directly related flood control infrastructure resiliency projects of the district through June 30 of each year.

(10)(a)

By October 1, 2023, and each October 1 thereafter, the district shall prepare and submit a consolidated annual report regarding the status of the United States Army Corps of Engineers Section 216 Central and Southern Florida Project Infrastructure Resiliency Study to the Office of Economic and Demographic Research, the department, the Governor, the President of the Senate, and the Speaker of the House of Representatives.

(b)

The report must include:A summary of the findings in the district’s annual sea level rise and flood resiliency plan.A list of structures that are expected to fall below the expected service level in the next 5 years.Initial recommendations for the refurbishment or replacement of the structures identified in subparagraph 2., including:
Future cost estimates and timelines for the refurbishment or replacement of the most vulnerable structures.
An estimate of project costs and current funds available to implement the recommendations for each vulnerable structure based on a 10-year horizon.
A summary of the state and federal funds expended toward the implementation of the United States Army Corps of Engineers Section 216 Central and Southern Florida Project Infrastructure Resiliency Study and other directly related flood control infrastructure resiliency projects of the district through June 30 of each year.
1. A summary of the findings in the district’s annual sea level rise and flood resiliency plan.
2. A list of structures that are expected to fall below the expected service level in the next 5 years.
3. Initial recommendations for the refurbishment or replacement of the structures identified in subparagraph 2., including:a. Future cost estimates and timelines for the refurbishment or replacement of the most vulnerable structures.b. An estimate of project costs and current funds available to implement the recommendations for each vulnerable structure based on a 10-year horizon.
a. Future cost estimates and timelines for the refurbishment or replacement of the most vulnerable structures.
b. An estimate of project costs and current funds available to implement the recommendations for each vulnerable structure based on a 10-year horizon.
4. A summary of the state and federal funds expended toward the implementation of the United States Army Corps of Engineers Section 216 Central and Southern Florida Project Infrastructure Resiliency Study and other directly related flood control infrastructure resiliency projects of the district through June 30 of each year.

Source: Section 373.1501 — South Florida Water Management District as local sponsor, https://www.­flsenate.­gov/Laws/Statutes/2024/0373.­1501 (accessed Aug. 7, 2025).

373.012
Topographic mapping
373.013
Short title
373.016
Declaration of policy
373.019
Definitions
373.023
Scope and application
373.026
General powers and duties of the department
373.033
Saltwater barrier line
373.036
Florida water plan
373.037
Pilot program for alternative water supply development in restricted allocation areas
373.042
Minimum flows and minimum water levels
373.043
Adoption and enforcement of rules by the department
373.044
Rules
373.046
Interagency agreements
373.047
Cooperation between districts
373.056
State agencies, counties, drainage districts, municipalities, or governmental agencies or public corporations authorized to convey or receive land from water management districts
373.069
Creation of water management districts
373.073
Governing board
373.076
Vacancies in the governing board
373.079
Members of governing board
373.083
General powers and duties of the governing board
373.084
District works, operation by other governmental agencies
373.085
Use of works or land by other districts or private persons
373.086
Providing for district works
373.087
District works using aquifer for storage and supply
373.088
Application fees for certain real estate transactions
373.089
Sale or exchange of lands, or interests or rights in lands
373.093
Lease of lands or interest in land and personal property
373.096
Releases
373.099
Execution of instruments
373.103
Powers which may be vested in the governing board at the department’s discretion
373.106
Permit required for construction involving underground formation
373.107
Citation of rule
373.109
Permit application fees
373.113
Adoption of rules by the governing board
373.114
Land and Water Adjudicatory Commission
373.116
Procedure for water use and impoundment construction permit applications
373.117
Certification by professional engineer
373.118
General permits
373.119
Administrative enforcement procedures
373.123
Penalty
373.129
Maintenance of actions
373.136
Enforcement of regulations and orders
373.139
Acquisition of real property
373.145
Information program regarding hydrologic conditioning and consumption of major surface and groundwater sources
373.146
Publication of notices, process, and papers
373.149
Existing districts preserved
373.171
Rules
373.175
Declaration of water shortage
373.185
Local Florida-friendly landscaping ordinances
373.187
Water management district implementation of Florida-friendly landscaping
373.199
Florida Forever Water Management District Work Plan
373.200
Seminole Tribe Water Rights Compact
373.0363
Southern Water Use Caution Area Recovery Strategy
373.0397
Floridan and Biscayne aquifers
373.0421
Establishment and implementation of minimum flows and minimum water levels
373.0465
Central Florida Water Initiative
373.0466
Central Florida Water Initiative Grant Program
373.0691
Transfer of areas
373.0693
Basins
373.0695
Duties of basin boards
373.0697
Basin taxes
373.0698
Creation and operation of basin boards
373.1131
Consolidated action on permits
373.1135
Small business program
373.1175
Signing and sealing by professional geologists
373.1391
Management of real property
373.1395
Limitation on liability of water management district with respect to areas made available to the public for recreational purposes without charge
373.1401
Management of lands of water management districts
373.1501
South Florida Water Management District as local sponsor
373.1502
Regulation of comprehensive plan project components
373.1725
Notice of intent by publication

Current through Fall 2025

§ 373.1501. S. Fla. Water Mgmt. Dist. as local sponsor's source at flsenate​.gov