Fla. Stat. 553.896
Mitigation grant program guideline


(1)

The Legislature finds that facilities owned by the government and those designated to protect the public should be the first to adopt the best practices, active risk management, and improved security planning. These facilities should be protected to a higher level.

(2)

Beginning with grant funds approved after July 1, 2005, the construction of new or retrofitted window or door coverings that is funded by a hazard-mitigation grant program or shelter-retrofit program must conform to design drawings that are signed, sealed, and inspected by a structural engineer who is registered in this state. Before the Division of Emergency Management forwards payment to a recipient of the grant, an inspection report and attestation or a copy of the signed and sealed plans shall be provided to the department.

(3)

If the construction is funded by a hazard mitigation grant or shelter retrofit program, the Division of Emergency Management shall advise the county, municipality, or other entity applying for the grant that the cost or price of the project is not the sole criterion for selecting a vendor.

(4)

A project funded under mitigation or retrofit grants is subject to inspection by the local building officials in the county in which the project is performed.

Source: Section 553.896 — Mitigation grant program guideline, https://www.­flsenate.­gov/Laws/Statutes/2024/0553.­896 (accessed Aug. 7, 2025).

553.70
Short title
553.71
Definitions
553.72
Intent
553.73
Florida Building Code
553.74
Florida Building Commission
553.75
Organization of commission
553.76
General powers of the commission
553.77
Specific powers of the commission
553.79
Permits
553.80
Enforcement
553.83
Injunctive relief
553.84
Statutory civil action
553.85
Liquefied petroleum gases
553.86
Public restrooms
553.88
Adoption of electrical and alarm standards
553.721
Surcharge
553.775
Interpretations
553.781
Licensee accountability
553.791
Alternative plans review and inspection
553.792
Building permit application to local government
553.793
Streamlined low-voltage alarm system installation permitting
553.794
Local government residential master building permit program
553.835
Implied warranties
553.837
Mandatory builder warranty
553.841
Building code compliance and mitigation program
553.842
Product evaluation and approval
553.844
Windstorm loss mitigation
553.865
Private spaces
553.883
Smoke alarms in one-family and two-family dwellings and townhomes
553.885
Carbon monoxide alarm required
553.886
Energy efficiency technologies
553.895
Firesafety
553.896
Mitigation grant program guideline
553.898
Preemption
553.899
Mandatory structural inspections for condominium and cooperative buildings
553.7921
Fire alarm permit application to local enforcement agency
553.7922
Local government-expedited approval of certain permits
553.7931
Alarm system registrations
553.7932
Simplified permitting processes
553.8425
Local product approval
553.8991
Resiliency and Safe Structures Act

Current through Fall 2025

§ 553.896. Mitigation grant program guideline's source at flsenate​.gov