Fla. Stat. 366.99
Natural gas facilities relocation costs


(1)

As used in this section, the term:“Authority” has the same meaning as in s. 337.401(1)(a).“Facilities relocation” means the physical moving, modification, or reconstruction of public utility facilities to accommodate the requirements imposed by an authority.“Natural gas facilities” or “facilities” means gas mains, laterals, and service lines used to distribute natural gas to customers. The term includes all ancillary equipment needed for safe operations, including, but not limited to, regulating stations, meters, other measuring devices, regulators, and pressure monitoring equipment.“Natural gas facilities relocation costs” means the costs to relocate or reconstruct facilities as required by a mandate, a statute, a law, an ordinance, or an agreement between the utility and an authority, including, but not limited to, costs associated with reviewing plans provided by an authority. The term does not include any costs recovered through the public utility’s base rates.“Public utility” or “utility” has the same meaning as in s. 366.02, except that the term does not include an electric utility.

(a)

“Authority” has the same meaning as in s. 337.401(1)(a).

(b)

“Facilities relocation” means the physical moving, modification, or reconstruction of public utility facilities to accommodate the requirements imposed by an authority.

(c)

“Natural gas facilities” or “facilities” means gas mains, laterals, and service lines used to distribute natural gas to customers. The term includes all ancillary equipment needed for safe operations, including, but not limited to, regulating stations, meters, other measuring devices, regulators, and pressure monitoring equipment.

(d)

“Natural gas facilities relocation costs” means the costs to relocate or reconstruct facilities as required by a mandate, a statute, a law, an ordinance, or an agreement between the utility and an authority, including, but not limited to, costs associated with reviewing plans provided by an authority. The term does not include any costs recovered through the public utility’s base rates.

(e)

“Public utility” or “utility” has the same meaning as in s. 366.02, except that the term does not include an electric utility.

(2)

A utility may submit to the commission, pursuant to commission rule, a petition describing the utility’s projected natural gas facilities relocation costs for the next calendar year, actual natural gas facilities relocation costs for the prior calendar year, and proposed cost-recovery factors designed to recover such costs. A utility’s decision to proceed with implementing a plan before filing such a petition does not constitute imprudence.

(3)

The commission shall conduct an annual proceeding to determine each utility’s prudently incurred natural gas facilities relocation costs and to allow each utility to recover such costs through a charge separate and apart from base rates, to be referred to as the natural gas facilities relocation cost recovery clause. The commission’s review in the proceeding is limited to determining the prudence of the utility’s actual incurred natural gas facilities relocation costs and the reasonableness of the utility’s projected natural gas facilities relocation costs for the following calendar year, and providing for a true-up of the costs with the projections on which past factors were set. The commission shall require that any refund or collection made as a part of the true-up process includes interest.

(4)

All costs approved for recovery through the natural gas facilities relocation cost recovery clause must be allocated to customer classes pursuant to the rate design most recently approved by the commission.

(5)

If a capital expenditure is recoverable as a natural gas facilities relocation cost, the public utility may recover the annual depreciation on the cost, calculated at the public utility’s current approved depreciation rates, and a return on the undepreciated balance of the costs at the public utility’s weighted average cost of capital using the last approved return on equity.

(6)

The commission shall adopt rules to implement and administer this section and shall propose a rule for adoption as soon as practicable after July 1, 2024.

Source: Section 366.99 — Natural gas facilities relocation costs, https://www.­flsenate.­gov/Laws/Statutes/2024/0366.­99 (accessed Aug. 7, 2025).

366.01
Legislative declaration
366.02
Definitions
366.03
General duties of public utility
366.04
Jurisdiction of commission
366.05
Powers
366.06
Rates
366.07
Rates
366.08
Investigations, inspections
366.09
Incrimination at hearing of commission
366.10
Judicial review
366.11
Certain exemptions
366.13
Taxes, not affected
366.14
Regulatory assessment fees
366.015
Interagency liaison
366.15
Medically essential electric public utility service
366.031
Definitions
366.032
Preemption over utility service restrictions
366.041
Rate fixing
366.042
Mutual aid agreements of rural electric cooperatives and municipal electric utilities
366.051
Cogeneration
366.055
Availability of, and payment for, energy reserves
366.057
Retirement of electrical power plants
366.071
Interim rates
366.072
Rate adjustment orders
366.075
Experimental and transitional rates
366.076
Limited proceedings
366.80
Short title
366.81
Legislative findings and intent
366.82
Definition
366.83
Certain laws not applicable
366.91
Renewable energy
366.92
Florida renewable energy policy
366.93
Cost recovery for the siting, design, licensing, and construction of nuclear and integrated gasification combined cycle power plants
366.093
Public utility records
366.94
Electric vehicle charging
366.095
Penalties
366.95
Financing for certain nuclear generating asset retirement or abandonment costs
366.96
Storm protection plan cost recovery
366.97
Redundant poles
366.98
Public utility liability arising out of emergencies and disasters
366.99
Natural gas facilities relocation costs
366.125
Natural gas jurisdiction limits
366.825
Clean Air Act compliance
366.8255
Environmental cost recovery
366.8260
Storm-recovery financing

Current through Fall 2025

§ 366.99. Nat. gas facilities relocation costs's source at flsenate​.gov